The Daniel Libeskind-designed stadium in the city of Tampere in southwest Finland is used for ice hockey games and concerts and can accommodate up to 15,000 visitors.
The complex, consisting of an arena, a hotel and two neighbouring residential towers, is entirely based on a concrete slab with four train tunnels running underneath. The hotel is partly built on top of the arena.
The challenge
The Getzner solution
Advantages for the customer
The special foundation situation at the NOKIA Arena building complex presented us with numerous challenges when designing the insulation solution. On the walls of the towers, we had to consider three separate bearing points for multi-axial load conditions in some cases.