The superstructure is under great stress on heavy traffic routes. Individual components are increasingly being damaged as a result. MRS Logistica S.A.in Brazil commissioned Getzner to develop a solution to reduce the maintenance costs for a heavy traffic route. The objective was to increase the availability of the route while minimising maintenance costs – without interfering too much in the superstructure system.
The challenge
The Getzner solution


Advantages for MRS Logistica S.A.
Modifying the stiffness enables the maintenance costs for a section of track to be considerably reduced. Getzner offers various solutions to this end. On the MRS track, the Getzner materials provide the superstructure with the required level of elasticity. In addition, it is clear that the rail pads do an exceptional job of withstanding the extremely high loads.