Since mid-2014, the Steigs hydroelectric power station in Mels has been supplying enough hydroelectric power to satisfy the annual needs of 3500 homes. The construction of the new underground power station building posed particular challenges to the owner, as hydroelectric power plants generate vibrations and subsequently sound radiation.
The challenges
The Getzner solution


Special features
The collaboration with Getzner went really smoothly. The technical support and consultation services provided were always prompt and highly proficient. The installation of the Sylomer® bearing was supervised and analysed by experienced Getzner employees.