The British Department of Transport is investing in new high-speed trains as part of its ‘InterCity Express Programme (IEP)’ railway investment plan. A high level of travelling comfort was a priority here. Elastic floating floors for rolling stock from Getzner provided the solution.
The challenge
Sylomer FR
The Getzner solution


©Hitachi Rail Europe Ltd.
How you benefit from our solution for floor bearings in carriages
©Hitachi Rail Europe Ltd.
©Hitachi Rail Europe Ltd.
We won the contract due to the exceptional performance of our materials, our extensive experience in equipping rolling stock and because our solution was the most cost-effective.
Up to date with the latest case studies
Contacts