-10.81045,-52.97312
Long-term test of rail pads on a heavy traffic route
The superstructure is under great stress on heavy traffic routes. Individual components are increasingly being damaged as a result. MRS Logistica S.A.in Brazil commissioned Getzner to develop a solution to reduce the maintenance costs for a heavy traffic route. The objective was to increase the availability of the route while minimising maintenance costs – without interfering too much in the superstructure system.